Second Bridge Over The Benoue River And Its Access In Garoua. Cameroon 

Basic design of the bridge over the Benue River and its access in Garoua. The project includes the alignment design of the bypass of the cities of Garoua and Pitoa with a typical cross section of 2+2 lanes with a 3 m walk/cycle lane. Several bridges and cantilever viaducts are included as major structures. The basic design also includes the hydrological and drainage studies, geotechnical and earthworks and social and environmental analysis.

Garoua, Cameroon  (2015 – 2019).