Riyadh Metro line 5. Kingdom of Saudi Arabia

Construction design of 3 deep underground stations, 1 underground depot with a built area of more than 44.000m2 and 13 ventilation and access shafts. A multidisciplinar team of more than 100 engineers was dedicated to the project. BIM methodology is used for the design of all disciplines (architectural design, structural design and MEP design).

Kingdom of Saudi Arabia (2016 – ongoing)