Basic Design, Construction design and Works supervision of 11.7 Km of high speed railway line (max. speed 350 Km/h). This section includes 2 viaducs with a length of 210 m each and a 374 m long tunnel.

Sant Boi de Llobregat / L’Hospitalet de Llobregat, Spain (2004-2009).