Design of Francolí River Outfall in Tarragona’s Harbor. The project includes the channeling of 945m of the river modifying its original course, a ramp structure allowing the emptying of the river inside the harbor (130m long and 6.6 m wide and requiring the dredging of 370.000 m3) , 365m of docks, submerged breakwater and a bridge connecting both river banks.

Tarragona, Spain. (1996 – 1998)